our portfolio

View some of the projects we have worked on.

Lotter Conulting has the capabilities and knowledge to consult, design and supervise a range of fire safety services. Our broad offerings and expertise means we can assist with project details throughout your process.

Browse our portfolio
of completed projects

Get in touch

pepkor warehouse

keystone industrial park, cliffdale

A 138,000m² storage warehouse in Cliffdale, Hammarsdale together with a process assembly facility and ancillary offices.

Lotter Consulting was responsible for the design, tender and supervision of the following

  • Combined sprinkler protection, fire hydrant and fire hose reel system installation per ASIB.
  • In-rack sprinkler protection
  • Rational fire design and fire safety strategy
  • Smoke ventilation consulting
  • Fire detection and manually activated audible alarm system
  • Fire signage
  • Cost control and financial management of the relevant fire sub-disciplines
  • Liaison and co-ordination of all fire-related services, with the other disciplines system inspections and reporting.

mossridge warehouse for freedom stationery

cornubia, durban

A 10,500m² storage warehouse in Cornubia with three ancillary office blocks.

Lotter Consulting was responsible for the design, tender and supervision of the following: 

  • Sprinkler protection system installations
  • Rational fire design and fire safety strategy
  • Smoke detection and audible alarm system
  • Fire signage
  • Cost control and financial management of the relevant fire sub-disciplines
  • Liaison and co-ordination of all fire-related services, with the other disciplines
  • Cost control and financial management of the relevant fire sub-disciplines
  • Liaison and co-ordination of all fire-related services, with the other disciplines system inspections and reporting.
  • System inspections and reporting

GUD HOLDINGS WAREHOUSE

ISANDO, JOHANNESBURG

A 9,900m² automotive parts and oil storage warehouse with ancillary offices.

Lotter Consulting was responsible for the design, tender and supervision of the following:

  • Sprinkler protection system installations
  • Rational fire design and fire safety strategy
  • Smoke detection and audible alarm system
  • Battery charging intrinsically safe ventilation and hydrogen monitoring
  • Flammable liquids store intrinsically safe ventilation and fire safety, including flammable vapour monitoring.
  • Fire signage
  • Cost control and financial management of the relevant fire sub-disciplines
  • Liaison and co-ordination of all fire-related services, with the other disciplines
  • System inspections and reporting

UMHLANGA ARCH MIXED USE DEVELOPMENT

umhlanga

This development is a mixed-use development and consists of the following main components:

  • 8 storeys of above ground podium parking
  • A 6,000m² SMG motor dealership with
    showrooms, offices and workshop.
  • Retail components
  • Loft apartments
  • A 22 storey residential tower
  • A 15 storey Hilton Hotel tower

Lotter Consulting was responsible for the design, tender and supervision of the following:

  • Sprinkler protection system design for the hotel, retail and SMG dealership
  • Fire safety strategy design
  • The passive fire protection designs – building compartmentation, occupant loads and evacuation strategies
  • The mechanical smoke extraction system designs where required per the fire safety strategy
  • The stairwell pressurization system designs for the two towers
  • Lift shaft pressurization designs where required per the fire safety strategy
  • Fire signage design
  • Cost control and financial management of the relevant fire sub-disciplines
  • Liaison and co-ordination of all fire-related services, with the other disciplines
  • System inspections and reporting

premier hotel

umhlanga

This development comprises of a 10 storey hotel.

Lotter Consulting was responsible for the design, tender and supervision of the following:

  • Fire safety strategy design
  • The passive fire protection designs – building compartmentation, occupant loads and evacuation strategies
  • The mechanical smoke extraction system designs where required per the fire safety strategy
  • The stairwell pressurization system designs
  • Lift shaft pressurization designs where required per the fire safety strategy
  • Fire signage design
  • Cost control and financial management of the relevant fire sub-disciplines
  • Liaison and co-ordination of all fire-related services, with the other disciplines
  • System inspections and reporting

ONELOGIX VEHICLE DISTRIBUTION SERVICE FACILITY

UMLAAS ROAD CATO RIDGE

A 5500m² truck stop fitment centre with vehicle shaded parking and ancillary support buildings.

Lotter Consulting was responsible for the design, tender and supervision of the following:

  • Sprinkler protection system for the fitment centre
  • Fire hydrant and fire hose reel design, including fire extinguisher layouts
  • Rational fire design and fire safety strategy
  • Fire signage layouts and specifications
  • Liaison and co-ordination of all fire-related services, with the other disciplines
  • System inspections and reporting

UMLAZI MEGA-CITY SHOPPING MALL EXTENSION

umlazi durban

This development was a 20,000 m² extension to the existing Umlazi Mega-City Shopping Mall.

Lotter Consulting was responsible for the design, tender and supervision of the following:

  • All wet fire protection systems
  • Smoke extraction system designs
  • Fire detection and audible alarm
  • Voice evacuation system design
  • Fire safety design and plans approval
  • Liaison and co-ordination of all fire-related services
  • System inspections and reporting
  • Cost-control and financial monitoring

MTUBA SHOPPING MALL

mtubatuba

This project was a new shopping mall.

Lotter Consulting was responsible for the design, tender and supervision of the following:

  • All wet fire protection systems
  • Smoke extraction system designs
  • Fire detection and audible alarm
  • Voice evacuation system design
  • Fire safety design and plans approval
  • Liaison and co-ordination of all fire-related services
  • System inspections and reporting
  • Cost-control and financial monitoring

NEDBANK HEAD OFFICES EXTENSION

durban

This was a 3-storey building extension (mezzanine plus 2 office floors).

Lotter Consulting was responsible for the design, tender and supervision of the following:

  • Sprinkler protection system installations
  • Rational fire design and fire safety strategy
  • The fire stopping and building compartmentation requirements,
  • The mechanical smoke extraction system
  • Cost control and financial management of the relevant fire sub-disciplines
  • Liaison and co-ordination of all fire-related services, with the other disciplines
  • System inspections and reporting

hilton hotel EXTENSION

lagos, nigeria

This project was an extension to an existing Hilton Hotel comprising of 6 storeys.

Lotter Consulting was responsible for the design of the following:

  • Sprinkler protection system design
  • Fire safety strategy design
  • The passive fire protection designs – fire stopping, building compartmentation, occupant loads etc.
  • Fire signage designs